Standards Matter. Since 1947. (02) 9642 3358 [email protected]

Projects

Schools Projects

St Joseph's College

‘Joeys’ School often engages British Concrete as Lead Contractor. Premium quality control standards are applied to practical and timely delivery as well as student safety and welfare.

Client: St Joseph's College
Project Value: $1,000,000

Artarmon Public School

Project work at Artarmon PS was undertaken by appointment through Lahey Constructions and Adco Constructions.

Client: Artarmon Public School
Project Value: $400,000

Russell Lea Public School

Project work at Russell Lea PS was undertaken by appointment through Cockram Constructions.

Client: Russell Lea Public School
Project Value: $1,000,000

Manly Vale Public School

Project work at Manly Vale PS was undertaken by appointment through Adco Constructions.

Client: Manly Vale Public School
Project Value: +$5,000,000

Public Sector

Bulli Train Station Stages 1 & 2

Platform reconstruction completed in 3 stages. Work done in railway possession during a 48 hour period. Stage 1 completed on time with a satisfied client.

Client: Sydney Trains
Project Value: $2,500,000

MUR Project Moorebank

Concrete pavements package including footings, kerbs , pavements and specialised army structures for new army base. Total job area 30,000m2

Client: John Holland
Project Value: $2,000,000+

Cobham Juvenile Justice Centre

Footings, slabs on ground and suspended, ramps, concrete toppings,exposed aggregate paving,plain concrete pavements and kerbs, floor repairs.

Client: Lahey Constructions
Project Value: $400,000+

Long Bay Correctional Centre

Excavation and sub grade works for new concrete roadway at the prison entrance for Corrective Services through Public Works. This required working in a high security environment.

Client: Public Works
Project Value: $250,000

Eastwood Station

Construction of new drainage and platform slabs during possessions allowing for works around the clock, post possession platform demolition and replacement.

Client: Railcorp
Project Value: $750,000+

Mascot Park

Demolition, construction of footings and coloured concrete walls to radius

Client: Botany Bay Council
Project Value: $60,000+

West Ryde Station

Demolish and reconstruction of existing platform over 3 weekend possessions.

Client: Sydney Trains
Project Value: $1,600,000

Richmond RAAF Base

Construction of new concrete footings, ground slab and suspended slabs for new control tower for Department of Defence with Lend Lease as the Managing contractor (No photos allowed due to security).

Client: Lend Lease
Project Value: $1,300,000

Kingsgrove station

Demolition and reconstruction of existing platform over 3 possession weekends with post possession works. The works involved the demolition and excavation of the existing platform and reinstatement using precast concrete culverts, backfilling, drainage works, and concrete suspended and ground slabs.

Client: Sydney Trains
Project Value: $1,900,000

Rhodes BBT Replacement Works

Works required the staged mass excavation of slope with stabilisation measures, Form-Reo-Pour of concrete slab, block wall installation, waterproofing, drainage and handrails. All works were completed within rail corridor outside of possession with trains running.

Client: Sydney Trains
Project Value: $600,000

General Works

Prestons Depot

British Concrete undertook the demolition and removal of the existing pavements and hardstands, removal and replacement of bad ground and reconstruction of heavy duty pavements. The total job area was 12,500m2. The works were completed in an operating facility which was staged to meet client requirements.

Client: Pel Holdings
Project Value: $1,750,000

Worth St Chullora

British Concrete was the head contractor on the project responsible for the excavation, construction of new concrete suspended ramp, construction of asphalt carpark and associated drainage, structural steel, electrical, fencing, floor repairs, landscaping and inter tenancy walls.

Client: The Lederer Group
Project Value: $1,500,000

Westfield Miranda

Construction of new carpark kerbs and islands, loading dock slabs, light pedestals and toppings – working in existing centre carpark to strict time frames.

Client: Westfield
Project Value: $400,000+

St Josephs College Hunters Hill

British Concrete has completed various projects over the last 2 years involving ground slabs,suspended concrete floors, concrete paving, stairs, grandstand seating, temporary and permanent roadways and asphaltic pavements. The works were completed in an active school facility to meet the staging requirements of the college.

Client: St Josephs College
Project Value: $900,000 plus

Astrazenica

British Concrete completed various works including roadway replacements, replacement of asphaltic concrete roadways, footings, correction of trip hazards and placement of bollards over a number of years direct for Astrazenica.

Client: Astrazenica
Project Value: $150,000 plus

Selleys Chemicals Padstow

British Concrete has completed various works over a number of years including new concrete slabs, floor and roadway repairs, new concrete foundation bases and bunded areas direct for Selleys.

Client: Selleys Chemicals
Project Value: $200,000 plus

Concrete Topping

Sutherland Trade Union Club

Suspended slabs, slabs on ground, concrete toppings,external concrete pavement and kerbs. Project completed while club was trading.

Client: Paynter Dixon
Project Value: $300,000+

Fanny Durack Aquatic Centre

Footings,slabs on ground, concrete topping ,structural pool modifications and ramps, coloured external paving, plain paving and kerbs, concrete benches and seats

Client: Rapid Constructions
Project Value: $450,000+

Canterbury Substation

Suspended concrete slabs and high tolerance toppings

Client: Leighton Contractors
Project Value: $100,000+

Russell Lea Public School

British Concrete has installed both natural and coloured reinforced concrete toppings for walkways and both internal and external areas through the school. These concrete topping works have provided the school with an eye catching architectural concrete feature.

Client: Cockram
Project Value: $1,250,000.00

Westfield Parramatta

British Concrete completed 19,000m 2 of concrete topping on polystyrene over levels 4, 5, and 6 of Westfield Parramatta. The lightweight topping design allowed the existing centre floor levels to meet the new design requirements. The Job involved installing polystyrene pods and doweling into the existing concrete and completing the topping over the pods and into the ribs between the pods.

Client: Westfield Design and Construction
Project Value: $3,000,000

North Sydney Pool

Hand mixed granolithic toppings to the entrance way of North Sydney Pool including coved skirtings to the Sydney landmark.

Client: Hansen Yunken
Project Value: $300,000

Edgecliff Station

Removal and replacement of existing platform coping with 50mm CTS topping. The CTS topping is a specialised high strength material used for its speed in setting. Completed 160m platform over a weekend possession.

Client: Sydney Trains
Project Value: $170,000

Roselands Shopping Centre Refurbishment

British Concrete has worked closely with ADCO construction on the refurbishment of Roselands Shopping centre bringing the oldest shopping centre in the southern hemisphere into 2019. Concrete topping works within the project included new concrete topping slabs for both ALDI and Woolworths trading floors, cool room wearing slabs for Liquor land and Woolworths using silicon carbide surface hardener and repairing existing concrete floors to provide a level concrete finish for tenancies and mall areas.

Client: ADCO Constructions
Project Value: $3,400,000 (Approx. $500,000 in topping works)

Concrete Repairs

Bondi Junction and Edgecliff Bus Interchanges

British Concrete completed the concrete joint repairs at both Bondi Junction and Edgecliff Bus interchanges while in operation. The work involved saw cutting damaged joints, filling joints with various epoxy and joint fillers, recutting and joint sealing. The works at Bondi were completed at night due to the high traffic during the day. Edgecliff works were carried out during the day. Both jobs were staged to meet the operation requirements of the sites.

Client: Transport NSW
Project Value: $550,000

Hawksbury Bridge

Repair of concrete cancer to the railway bridge pylons. Works include breaking away damaged concrete, sandblasting, treating reinforcement, patching with epoxy mortar and epoxy injection to cracks.

Client: Sydney Trains
Project Value: $350,000

Wyong, West Ryde, Lindfield, Edgecliff, Hawksbury, East Hills St

Removal and replacement of damaged platform coping and replacing with a new coping using CTS material (rapid set cement product). Works also include reinstating tactile indicators and line marking. These works are completed over a possession weekend.

Client: Sydney Trains
Project Value: $1,200,000

Turrella Bridge

British Concrete completed both concrete bridge repairs and waterproofing to railway bridge. Works including waterproofing the top of the bridge structure, underbridge scaffolding, and treating cracks and damaged areas to the underside of the bridge by scabbling, installing epoxy mortars and epoxy injection grouting. Works were completed during one possession weekend and non-possession shifts.

Client: Sydney Trains
Project Value: $190,000

St Marys Overbridge

British Concrete completed a range of concrete bridge repair works including breaking away damaged concrete, sandblasting, treating reinforcement, patching with epoxy mortar and epoxy injection to cracks

Client: Sydney Trains
Project Value: $180,000

Building Sector

Castle Towers Carpark Upgrade

Construction of ground slabs, suspended slabs and ramps, island kerbs, remediation to concrete cancer, joint repairs for Lend Lease in an operating shopping centre.

Client: Lend Lease
Project Value: $1,250,000

Wallerawang Substation - Stage 1

Construction of footings, foundations, concrete in ground pits, slabs on ground, bunded areas and circular concrete tanks and concrete paving. Relocated a team to Wallerawang for the duration of the project.

Client: John Holland
Project Value: $1,200,000+

Anytime Fitness Mount Druitt

Demolition works, excavation of existing asphalt, new subbase and concrete ground slabs and external paths and ramps.

Client: Westfield
Project Value: $200,000+

Baxter Warehouse & Carpark

Construction of warehouse complete including footings, pedestals, warehouse floor, truck handstands and carpark.

Client: Baxter Health Care
Project Value: $1,500,000

Roselands Shopping Centre Refurbishment

British Concrete has worked closely with ADCO construction on the refurbishment of Roselands Shopping centre bringing the oldest shopping centre in the southern hemisphere into 2019. Works have included: New concrete foundations, column encasements, and suspended concrete slabs, slab on ground slabs including subgrade preparation works, suspended lift pits, travellator and lift pits, dock levellers, kerbing and concrete topping slabs for both ALDI and Woolworths trading floors, concrete cool room wearing slabs, and concrete slab and column repairs.

Client: ADCO Constructions
Project Value: $3,400,000

Bulli Station Stages 1 & 2

Construction of platforms 1 & 2 involving demolition and reconstruction of platforms over 6 week end possessions and non-possession shifts. The works involved the demolition and removing of the existing platform and construction of new platforms using precast culverts, concrete panels, Form-Reo-Pour construction and asphaltic concrete.

Client: Sydney Trains
Project Value: $2,500,000

Cessnock Correctional Centre

Construction of greenfield prison in the Hunter. This job required the installation of over 19,000m2 of slab on ground and suspended concrete slabs completed in a short timeframe for Corrective Services with Lend Lease as the head contractor.

Client: Lend Lease
Project Value: $7,000,000

Architectural Concrete

Darling Walk

Landmark Sydney project completed in the Darling Harbour Precinct for Christie Civil. Our works consisted of architectural items such as curved concrete walls, benching, seating, paving and the intricate central water feature.

Client: Christie Civil
Project Value: $1,000,000

Chau Chak Wing Building

British Concrete completed the high tolerance concrete topping to the entry level and level 1 which were burnish finished with the application of a clear floor sealer which made the floors a feature of the unique entry area. The feature of the concrete topping for the building was specifically selected by the architect Gehry to meet the unique architectural design of the building. External paving around the building was also part of our works.

Client: Lend Lease
Project Value: $500,000

Wilga Park Macquarie Park

Architectural concrete walls and seating completed to create an outdoor theatre and recreational space for Ryde Council. The project consisted of tiered outdoor seating, concrete walls, stairways and concrete paving. The final product is a unique outdoor area whose predominant feature is the curved concrete seating that wraps around the northern end of the park.

Client: Glascott Landscape and Civil
Project Value: $400,000

Gore Hill Park

British Concrete completed the architectural concrete walls, concrete stairs, paving including perimeter paving with a washed aggregate finish. The concrete works are an architectural feature of this landmark public space.

Client: Glascott Landscape and Civil
Project Value: $600,000