Standards Matter. Since 1947. (02) 9642 3358 [email protected]

Rhodes BBT Replacement Works

Rhodes BBT Replacement Works
Rhodes BBT Replacement Works

Works required the staged mass excavation of slope with stabilisation measures, Form-Reo-Pour of concrete slab, block wall installation, waterproofing, drainage and handrails. All works were completed within rail corridor outside of possession with trains running.