Bulli Train Station Stages 1 & 2

Platform reconstruction completed in 3 stages. Work done in railway possession during a 48 hour period. Stage 1 completed on time with a satisfied client.

Client: Sydney Trains
Project Value: $2,500,000

MUR Project Moorebank

Concrete pavements package including footings, kerbs , pavements and specialised army structures for new army base. Total job area 30,000m2

Client: John Holland
Project Value: $2,000,000+

Cobham Juvenile Justice Centre

Footings, slabs on ground and suspended, ramps, concrete toppings,exposed aggregate paving,plain concrete pavements and kerbs, floor repairs.

Client: Lahey Constructions
Project Value: $400,000+

Long Bay Correctional Centre

Excavation and sub grade works for new concrete roadway at the prison entrance for Corrective Services through Public Works. This required working in a high security environment.

Client: Public Works
Project Value: $250,000

Eastwood Station

Construction of new drainage and platform slabs during possessions allowing for works around the clock, post possession platform demolition and replacement.

Client: Railcorp
Project Value: $750,000+

Mascot Park

Demolition, construction of footings and coloured concrete walls to radius

Client: Botany Bay Council
Project Value: $60,000+

West Ryde Station

Demolish and reconstruction of existing platform over 3 weekend possessions.

Client: Sydney Trains
Project Value: $1,600,000

Richmond RAAF Base

Construction of new concrete footings, ground slab and suspended slabs for new control tower for Department of Defence with Lend Lease as the Managing contractor (No photos allowed due to security).

Client: Lend Lease
Project Value: $1,300,000

Kingsgrove station

Demolition and reconstruction of existing platform over 3 possession weekends with post possession works. The works involved the demolition and excavation of the existing platform and reinstatement using precast concrete culverts, backfilling, drainage works, and concrete suspended and ground slabs.

Client: Sydney Trains
Project Value: $1,900,000

Rhodes BBT Replacement Works

Works required the staged mass excavation of slope with stabilisation measures, Form-Reo-Pour of concrete slab, block wall installation, waterproofing, drainage and handrails. All works were completed within rail corridor outside of possession with trains running.

Client: Sydney Trains
Project Value: $600,000