Standards Matter. Since 1947. (02) 9642 3358 [email protected]

Wallerawang Substation - Stage 1

Construction of footings, foundations, concrete in ground pits, slabs on ground, bunded areas and circular concrete tanks and concrete paving. Relocated a team to Wallerawang for the duration of the project.